Location: Milagro, Ecuador
Client: UNFCCC secretariat
Duration: 2011
Origin of funding: UNFCCC secretariat
Description:
Assessing verification of the emission reduction monitoring, calibration and calculation at the Codana Biogas Plant in Milagro, Ecuador. The work is carried out on site and is timed when the accredited entity is carrying out its verification. The method of checking the installation itself is supervised, auditing of data and document records is assessed. Assessing the verification reports resulting from the on site verification is also part of the task
Environmental consultancy projects